Beginning Saturday, April 28th, the Fountain Street student entrance and exit of the Bostwick parking ramp will be closed for the summer renovations. The employee entrance off Fountain street will also be closed.
All traffic will need to enter the ramp from Ransom Street. The lower two levels of the ramp will be closed completely, as will a small section of level three. The contractors will be blocking off access to the impacted areas and have determined the route to maintain circulation in the ramp. During the project, there will be no separation between student and staff parking; it will be shared space.