Bostwick Ave partially closed today through Wednesday for construction crane

Beginning today, November 19, Rockford Construction will be installing a large crane to swing equipment on to the roof top of the Ford Field House.

As a result, Bostwick Avenue, north of Lyon Street, will be closed up to the Lyon student parking entrance.

The pedestrian sidewalk on the east side of the street will also be closed. Pedestrians will need to use the sidewalk on the west side of the street, and then cross back over at the corner of Bostwick and Crescent.

The sky walks from the Lyon ramp and from the Science building will also be closed. Students will need to enter the parking ramp coming from the north, either up Crescent or on Bostwick from Michigan.

The crane will be in place today through Wednesday. Rockford will have additional safety personnel on site and positioned in areas to assist with directing students.

Construction reminder: Bostwick Ave partially closed Monday-Wednesday

Beginning Monday, November 19, Rockford Construction will be installing a large crane to swing equipment on to the roof top of the Ford Field House.

As a result, Bostwick Avenue, north of Lyon Street, will be closed up to the Lyon student parking entrance.

The pedestrian sidewalk on the east side of the street will also be closed. Pedestrians will need to use the sidewalk on the west side of the street, and then cross back over at the corner of Bostwick and Crescent.

The sky walks from the Lyon ramp and from the Science building will also be closed. Students will need to enter the parking ramp coming from the north, either up Crescent or on Bostwick from Michigan.

The crane will be in place Monday-Wednesday. Rockford will have additional safety personnel on site and positioned in areas to assist with directing students.

Bostwick Ave partially closed Monday-Wednesday for construction crane

Monday, November 19, Rockford Construction will be installing a large crane to swing equipment on to the roof top of the Ford Field House.

As a result, Bostwick Avenue, north of Lyon Street, will be closed up to the Lyon student parking entrance.

The pedestrian sidewalk on the east side of the street will also be closed. Pedestrians will need to use the sidewalk on the west side of the street, and then cross back over at the corner of Bostwick and Crescent.

The sky walks from the Lyon ramp and from the Science building will also be closed. Students will need to enter the parking ramp coming from the north, either up Crescent or on Bostwick from Michigan.

The crane will be in place Monday-Wednesday. Rockford will have additional safety personnel on site and positioned in areas to assist with directing students.

CAB to host GRCC Trunk-O-Treat on October 20

The GRCC Campus Activities Board is hosting a Trunk-O-Treat on Saturday, October 20, from 9 a.m. – 12 p.m. on the top level of the Bostwick Parking Ramp! Bring your kids/siblings for candy, face painting, and to meet some special friends! Face painting is FREE to GRCC Students and $3 to Faculty and Staff.

CAB is also accepting volunteers/departments who would like to bring a car and decorate their trunk. CAB will supply the candy for those who provide a trunk.

FREE donuts for all contest participants.

Please sign up using this form.

For questions, please contact Kaitlynn Karl at kaitlynnkarl@email.grcc.edu.

New Electronic Vehicle Charging Stations in Bostwick Parking Ramp

ChargePoint logo for EV charging stations

Two new electric vehicle (EV) charging stations are available for staff, student, and visitor use within the Bostwick Parking Ramp.  The staff charging station is located near the staff parking entrance off Fountain NE.  The student/visitor station is located near the Bostwick NE ramp entrance.  Each station is able to accommodate two cars at a time on adjacent parking spaces.  Only electric vehicles that are using the charging stations may park in the designated spots which are painted green.

The EV charging stations are fully managed by ChargePoint, one of the world’s largest EV charging networks. Support is available 24/7 from ChargePoint either through the app or the support number listed on the station’s interactive screen. For additional information, and to use the station, drivers simply download the ChargePoint mobile app and sign up for a free ChargePoint account. Full details on how to access EV charging stations through ChargePoint can be found at the ChargePoint website including training videos and FAQs.  (www.chargepoint.com)

The cost to use an EV station is 15 cents per kilowatt hour. In order to use a station, you must have a ChargePoint account. In addition to station usage fee, users must have a valid parking permit or pay the designated parking fees. To ensure that access is available to as many users as possible, vehicles using the charging stations must be moved to a regular parking space within the Bostwick Ramp or exit the ramp when fully charged. When the vehicle is charged, ChargePoint will send the user a notification that the car is charged, and that they have 30 minutes to move the vehicle. After the 30 minute time period the user will be charged $1.00 per hour.

If the EV charging stations in the Bostwick Parking Ramp are highly utilized, more stations will be considered in the future.

More information can be found on our website at: https://www.grcc.edu/facilities/evchargingstations

New Electronic Vehicle Charging Stations on Campus

ChargePoint logo for EV charging stations

Two new electric vehicle (EV) charging stations are available for staff, student, and visitor use within the Bostwick Parking Ramp.  The staff charging station is located near the staff parking entrance off Fountain NE.  The student/visitor station is located near the Bostwick NE ramp entrance.  Each station is able to accommodate two cars at a time on adjacent parking spaces.  Only electric vehicles that are using the charging stations may park in the designated spots which are painted green.

The EV charging stations are fully managed by ChargePoint, one of the world’s largest EV charging networks. Support is available 24/7 from ChargePoint either through the app or the support number listed on the station’s interactive screen. For additional information, and to use the station, drivers simply download the ChargePoint mobile app and sign up for a free ChargePoint account. Full details on how to access EV charging stations through ChargePoint can be found at the ChargePoint website including training videos and FAQs.  (www.chargepoint.com)

The cost to use an EV station is 15 cents per kilowatt hour. In order to use a station, you must have a ChargePoint account. In addition to station usage fee, users must have a valid parking permit or pay the designated parking fees. To ensure that access is available to as many users as possible, vehicles using the charging stations must be moved to a regular parking space within the Bostwick Ramp or exit the ramp when fully charged. When the vehicle is charged, ChargePoint will send the user a notification that the car is charged, and that they have 30 minutes to move the vehicle. After the 30 minute time period the user will be charged $1.00 per hour.

If the EV charging stations in the Bostwick Parking Ramp are highly utilized, more stations will be considered in the future.

More information can be found on our website at: https://www.grcc.edu/facilities/evchargingstations

Bostwick parking ramp update

The top entrance and exit of the Bostwick parking ramp on Ransom Avenue is expected to remain closed for the remainder of the week due to continuing repair work. All employees will need to enter the ramp from the first level student entrance off Fountain Street. Ramp exits from level five and level one will both be open.

Thank you for your patience as the repair work continues.

 

Ransom Avenue entrance to Bostwick parking ramp closed as repairs continue

Due to continued emergency repair work, the top entrance and exit of the Bostwick parking ramp on Ransom Avenue will be closed on Tuesday, June 12. All employees will need to enter the ramp from the first level student entrance off Fountain Street. Ramp exits from level five and level one will both be open.

Thank you for your patience.

Emergency closing at Ransom Street

There is a steam leak in the underground line in Ransom Street between the Music Building and the Student Center, which has also impacted AT&T utilities.  Facilities is in the process of coordinating an emergency repair, which will force a street closure at the north end of Ransom.  This means there will be no left turn from Lyon Street onto Ransom, so individuals needing to access the Bostwick Ramp will need to enter Ransom from Fountain Street.  All exiting ramp traffic will also need to turn right toward Fountain Street.

This repair will begin as soon as Facilities can coordinate the work and coordinate with the City.   At this point, the estimated length of the project is unknown, as that will need to be determined once they can assess the damage.

Please share this information with your constituents as a “heads-up” that this closure will be coming.  Contact Victoria Janowiak if you have questions!